Single
Family Residence
Kitchen cabinets (no island)
Northern exposure
Front Door - (temp door)
Kitchen cabinets w/island
Back patio
Front Yard ......
SubSurface wastewater system
distribution box
trenches
Prep for outside flat work
Condensate Drain
tankless water heater
Final Conduit reach (UG Cable service)
24 May 2014
Waiting for Concrete "Sealer"
11 April 2014
Concrete Stained floor
11 April 2014
Concrete Stained floor
11 April 2014
Walls masked for concrete floor treatment
08 April 2014
Master Bath tile detail
03 April 2014
Floor curing blanket pulled 12th March 2014
dining room floor
Floor poured and finished 25th August 2013
Tile preparation
Waterproofing for master shower
Bathroom progress
Cultured marble +front shower+
Conduit N.E. Corner garage
Network Cable for Driveway access control
Garage Floor poured and finished
3rd March 2014
.... from the back entry
Reuben and his "Rake"
Eugene Sand & Gravel "Mixer"
7:30am 3rd March 2014
Tongue and Groove Pine
Exterior Ceiling
Temp front door
Smoke detector connection
+top of the stairs+
Plaster complete
T & G Pine patio ceiling
+ 2 March +
+Siding+
South Elevation
18 Feb
Siding / Soffit
Front Door
(temp door in place)
siding detail
plaster texture
test "a"
plaster texture
test "b"
dumb waiter in pantry
Master with wall board
waiting for plaster
NWNG service installed - waiting for 1" meter
+ 17 Feb 2014 +
NWNG service line
|
Garage - drywall in place
08 Feb 2014 |
|
Drywall installed on the "harry potter" room 5 Feb 2014 |
|
Siding installation continuing |
Insulation placed
Cleaning - just before insulation -
"Finish" application of Dryvit
"Base coat" of Dryvit
|
Soffit texture and color |
|
NWNG conduit along with crossing under driveway |
|
trench and NWNG service along driveway |
|
NWNG 2 "conduit + extra 1 1/2" conduit & tracer wire. |
|
26 Jan. 2014 - installing conduit for Natural Gas Supply line |
|
Siding has begun ! ! ! 23 Jan 2014 |
|
siding design = 2 eight inch exposure, then 2 four inch exposure, repeat |
|
corner trim detail |
Siding product : Hardie Plank
23 Jan 2013
|
Exterior window trim |
|
18 Jan ... exterior window trim installed |
|
Plywood underlayment along entryway |
|
Soffit - Just outside dining room window |
|
Structured cable box - in office |
|
Dumb Waiter shaft has been "rocked" ..... |
|
Electrical panel - should be here soon - |
|
Thermostats roughed in for the floor heat |
Dining Room Windows
Great Room Windows
Building Wrap
Washer Dryer connection
Gas fire place rough-in
Lav plumbing rough-in
HVAC supply lines
Final Column installed
Copper flashing along roof line
All "hurricane clips" installed
|
back roof valley - Friday 13, 2013 |
|
front entrance with roofing |
|
storage room floor |
|
Driveway at 10 degrees |
|
Fireplace framing and staircase
|
|
bath tub mock up |
|
the "orchard" at near 0 degrees F. |
December snow event (about 8") dried in the night before
roof felt ... just in time
|
almost "dryed in" .. |
f
|
"Dry fit" the in floor heat manager 24 November ... |
|
Facia - roof sheeting under construction |
|
Column - back patio |
|
Column Base |
|
2 - 1/8th bends along West Side (4" PVC) waste water connection |
|
West clean out at building wall 21 November |
|
4" PVC connection to septic tank .. |
|
Front door framing ... at dusk ..... 12 Nov, 2013 |
|
BIG truss |
|
truss' |
|
southern elevation |
|
plywood sheathing installed |
|
exterior laundry and office wall |
|
Murphy Plywood arrived 7 Nov 2013 |
|
Back Patio |
|
Glue Lam hardware |
|
Front Entrance |
|
Office and Laundry |
|
Kitchen Walls |
|
Back door header |
|
top plate detail |
|
Refrigerator offset adjust for counter depth ... |
|
Pantry .... closet |
|
double exterior wall detail |
|
Double 2x4 exterior wall w/2" gap - corner detail |
|
Great room window framing, sill RO is 8 1/2" above finished floor. |
|
Exterior wall framing ... getting close ... |
|
1st wall is set .... 30th October 2013 |
|
Septic tank installed |
|
1500 gal tank |
|
Water Service along West Side of foundation |
|
Carpenters ... installing "plate" 28 October, 2013 |
Foundation blanket in place
|
Slab with curing blanket |
|
block outs for curbless shower and bath tub |
|
6" slab - poured - 25 October, 2013 |
|
column footings for entrance
|
form for : |
30 x 30 x 12 footing w 4 #4 each way |
|
heating system prior to pour |
|
steel, wire mesh, pex tubing |
|
#4 steel - 18" o/c |
|
Tubing guides / Elect. conduit |
|
Heating system guide east side |
|
Laundry room / Master Bedroom door |
|
CDF in place
"rat slab"
3" controlled density fill (lightweight conc) slab under the 3" of rigid insulation
Steel, wire mesh and 6" of concrete yet to come
|
|
CDF being placed |
|
Blue line = CDF grade
18" crushed rock
base course for slab foundation |
|
Footing / Stem wall detail
Wastewater service line
near rear garage door |
|
Trench for electrical service
from panel in pumphouse |
|
communication line conduit
inside foundation |
|
Batter Board N.E. Corner
(29 August 2013)
|
|
Permits displayed along driveway |
|
PLAN VIEW
|
|
..... peace ...... |
No comments:
Post a Comment